黄金视频app免费大全|最近中文字幕第一页|中文字幕无产乱码|国产精品久久久久久久久果冻传媒

歡迎訪問永誠廣建公路材料(山東)有限公司網站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

水泥穩(wěn)定碎石施工采用什么施工工藝

來源:http://www.62wa.com/ 日期:2022-09-30
濟南水泥穩(wěn)定碎石施工采用什么施工工藝呢?實際上會采用商品水穩(wěn)(預拌),用機械攤鋪、壓路機碾壓的施工工藝。下面詳細講下:
What construction technology is used in Jinan cement stabilized macadam construction? In fact, the construction technology of commercial water stabilization (premix), mechanical paving and roller rolling will be adopted. Let's talk about it in detail:
1、原材料基本要求普通硅酸鹽水泥、礦渣硅酸鹽水泥、火山灰質硅酸鹽水泥都可以用于水泥穩(wěn)定碎石路面基層施工,禁止使用快硬水泥、早強水泥以及其它受外界影響而變質的水泥。
1. Basic requirements for raw materials Ordinary Portland cement, slag Portland cement and pozzolanic Portland cement can be used for the construction of cement stabilized macadam pavement base. Fast hardening cement, early strength cement and other cement deteriorated by external influence are prohibited.
路面基層宜采用強度等級較低的水泥;水泥各齡期強度、安定性等應達到相應指標要求;要求水泥初凝時間3小時以上、終凝時間不小于6小時。
Cement with lower strength grade should be used for pavement base course; The strength and stability of cement at each age shall meet the corresponding index requirements; The initial setting time of cement shall be more than 3 hours and the final setting time shall not be less than 6 hours.
2、水泥穩(wěn)定碎石施工前準備
2. Preparation before construction of cement stabilized macadam
①本工程水泥穩(wěn)定碎石基層的下承層為水泥穩(wěn)定土基層,水泥穩(wěn)定碎石攤鋪須在水泥穩(wěn)定土達到規(guī)定的強度、平整度、拱度等基礎上,經驗收后,才能進行攤鋪。
① The lower bearing layer of the cement stabilized macadam base course of this project is the cement stabilized soil base course. The cement stabilized macadam can only be paved after the cement stabilized soil reaches the specified strength, flatness, camber, etc.
②恢復中線。每10~15m設置一樁,用指示樁標出攤鋪寬度。
② Restore the center line. One pile shall be set every 10~15m, and the paving width shall be marked with an indicator pile.
③進行水平測量。在每一斷面上設置3個指示樁(即中心樁、左側邊樁和右側邊樁),用明顯標記標出水泥穩(wěn)定碎石基層松鋪厚度和設計高程。
③ Carry out level measurement. Set 3 indicator piles (i.e. center pile, left side pile and right side pile) on each section, and mark the loose paving thickness and design elevation of cement stabilized macadam base with obvious marks.
濟南水泥穩(wěn)定碎石
④培肩。為減少水泥穩(wěn)定碎石混合料在碾壓過程中的側向位移,保證水泥穩(wěn)定碎石壓實度,采取培肩措施,培肩上口寬50cm下口寬70cm,高度不小于水泥穩(wěn)定碎石壓實厚度。為保證雨天排水,可每隔5~10m開挖臨時排水溝。
④ Shoulder training. In order to reduce the lateral displacement of cement stabilized macadam mixture during rolling and ensure the compactness of cement stabilized macadam, shoulder training measures are taken. The width of the upper opening of the shoulder is 50cm and the width of the lower opening is 70cm. The height is not less than the compacted thickness of cement stabilized macadam. To ensure drainage in rainy days, temporary drainage ditches can be excavated every 5-10m.
⑤施工前須詳細計劃安排,盡量減少橫向接縫,避免縱向接縫。
⑤ Before construction, detailed planning and arrangement shall be made to minimize transverse joints and avoid longitudinal joints.
水泥穩(wěn)定碎石施工采用什么施工工藝?以上就是問題的相關解答了,您對此有什么想法或者問題咨詢,都能來我們網站http://www.62wa.com咨詢!
What construction technology is used for cement stabilized macadam construction? The above is the answer to the question. If you have any ideas or questions, please come to our website http://www.62wa.com consulting service
  • 上一條:修路用的瀝青到底是什么
  • 下一條:路面機械設備的維護與保養(yǎng)
  • 黄金视频app免费大全|最近中文字幕第一页|中文字幕无产乱码|国产精品久久久久久久久果冻传媒

    午夜福利手机在线观看| 国产高清精品一区二区三区| 久久99国产精品二区护士| 亚洲av男人天堂| 国产精品一区二区三区四区| 日韩福利片在线观看| 性丰满少妇| 精品一区二区三区在线播放| 91人妻人人爽| 久久国产麻豆| 人妻人公侵犯人妻小泽| 亚洲色图欧美另类| 高潮喷水xxxx| 亚洲乱码国产乱码精品精| 91麻豆精品国产自产高清观看| 国产熟女乱子伦露脸简介| 国产精品mv在线观看| 久久久亚洲一区二区三区| 欧美日韩国产在线| 成人精品一区二区三区| a毛片免费看| 日本暖暖在线视频| 91精品人妻互换一区二区| 夜夜人妻| 国产精品久久久av| 国产一精品一av一免费| 日韩一级精品视频在线观看| 国产精品久久久久久久久久大尺度 | 女同性av| 欧美一级三级在线观看| 久久久久久久久久久精品成| 欲望都市电影| 日韩欧美国产中文| 久久久久久久久久久久亚洲| 岛国av网址| 一区二区三区亚洲视频| 暖暖视频在线日本| 豆国产97在线 | 亚洲| 午夜久久久久久久久久| 国产一区二区三区精品久久久无广告| 欧美一区二区三区片|